Explore your interchange
Pick a train station, then a bus route that connects there, to see the measured connection reliability for your specific situation — the same method used for the headline figures below.
Headline interchanges
How to read this page
Each figure is the share of measured departures at that interchange, across the connecting lines/routes shown, that stayed within the connection window over the last 7 days — i.e. did not depart more than the window's minutes early or late. Interchange windows are this project's own configuration (indicative of a real change of service), not an official Transport for NSW measure — new train/bus pairs default to a 2-minute window unless specially configured. Departure data is collected directly from the Transport for NSW Open Data feed by a local, continuously-running collector; nothing here is modelled, estimated or extrapolated. Full per-service records are retained as an audit trail.